Heavy Machinery Shipping & Logistics Policy
1. Logistics & Transportation
At MP Engineering, we coordinate safe transit for heavy chemical equipment (reactors, distillation columns, storage tanks) via specialized heavy-haul trucks, low-bed trailers, and container freight across India and overseas ports.
2. Dispatch Lead Times
Standard fabrication and testing lead time ranges from 2 to 6 weeks depending on vessel capacity and design pressure parameters. Dispatch confirmation will be shared prior to truck loading.
3. Transit Insurance & Handling
All consignments are securely wooden-crated or saddle-mounted. Transit insurance and unloading lifting equipment (cranes) at site remain per agreed contract terms (FOB/CIF/Ex-Works Bakrol).
4. Logistics Support
For logistics inquiries or shipment tracking updates, contact our dispatch team at info@mpengineering.co.in or +91-97240 09770.
